tasks: open the PNAS submission campaign (work order + plan)

Post-hold reassessment (2026-08-11): fresh lit scan confirms the core
claims (speciation/BDMI, evolution-of-sex framing, mating systems,
headroom law) remain unclaimed; new concessions identified
(First-Extinction 2509.20101, quantitative-trait 2407.17493,
verifier-injection 2510.16657) and one methodological threat to E13
(richer symmetry groups, 2606.23607). Venue check ranks PNAS first
(direct 2026 precedent: "Evolvable AI" + letters), over PLoS Comp Bio
(scope risk). Five-phase plan: E13 hardening -> arXiv preprint ->
llm_speciation + multi-seed -> PNAS manuscript -> submission mechanics.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01BkRLcc18rwT2Lysu6PbG7v
This commit is contained in:
Giorgio Gilestro 2026-09-06 12:34:59 +01:00
parent f5f68f5249
commit 72d5e9e736
2 changed files with 171 additions and 0 deletions

View file

@ -393,3 +393,11 @@ C3 vertical claim deferred.*
wins where easy tasks let a strong base compose to ceiling. Vindicates E8 max>mean at 7B.
- `configs/llm/{moe_hard,moe_hard_hpc,directed_hard_hpc}.yaml`, `hpc/llm_hard.pbs`, hard READMEs+figures,
+1 test (131 green). `results/llm_{moe,directed}_hard_hpc/`.
**2026-08-11 — PNAS submission campaign opened.** GG approved PNAS as target after the post-hold
re-assessment (fresh lit scan: speciation/sex-framing/mating-systems/headroom all still unclaimed;
new concessions First-Extinction 2509.20101 + qt-trait 2407.17493 + verifier-injection 2510.16657;
E13 exposed to richer-symmetry objection 2606.23607). Full plan: `tasks/workorder-pnas-submission.md`.
Phases: (1) E13 hardening (scale-aware alignment + emergent-divergence condition), (2) arXiv preprint,
(3) llm_speciation + multi-seed LLM arc, (4) PNAS-format manuscript (5 consolidated figures, dual
audience), (5) submission mechanics (Zenodo DOI, cover letter, editor/reviewer suggestions).